N.Y. Comp. Codes R. & Regs. Tit. 6 §§ 361-2.6

Current through Register Vol. 46, No. 45, November 2, 2024
Section 361-2.6 - Permit application requirements for storage facilities

A storage facility for waste destined for land application, that is not an exempt facility or subject to the registration provisions of section 361-2.3 of this Subpart, must obtain a permit and must submit an application that includes the requirements identified in this section and section 360.16. The application must include:

(a) For surface impoundments, a construction plan for the facility including a construction quality assurance/construction quality control plan.
(b) For surface impoundments, a hydrogeologic report that is consistent with the applicable provisions of Part 363 and that identifies or characterizes the depth to groundwater and bedrock, the critical stratigraphic section and the direction of groundwater flow. The report must also discuss the monitorability of the facility, location of any recharge areas for primary or principal aquifers and the location of any unstable areas.
(c) A description of how the facility will comply with the operating requirements in section 360.19 of this Title and section 361-2.7 of this Subpart.

N.Y. Comp. Codes R. & Regs. Tit. 6 §§ 361-2.6

Adopted New York State Register September 20, 2017/Volume XXXIX, Issue 38, eff. 11/4/2017
Amended New York State Register June 7, 2023/Volume XLV, Issue 23, eff. 7/22/2023
Amended New York State Register June 21, 2023/Volume XLV, Issue 25, eff. 7/23/2023