Whenever a written contract entered into on or after July 1, 1984 provides that payment must be preceded by an inspection period or by an audit to determine resources applied or used by the contractor, the contract shall set forth the maximum period within which the inspection or audit shall be completed or conducted.
N.Y. Comp. Codes R. & Regs. Tit. 2 § 18.21