The 18-month period established by section 426.5 of this Chapter is the permitted maximum. Within a given municipality, actual time for completion may be further limited.
N.Y. Comp. Codes R. & Regs. Tit. 19 § 427.5
The 18-month period established by section 426.5 of this Chapter is the permitted maximum. Within a given municipality, actual time for completion may be further limited.
N.Y. Comp. Codes R. & Regs. Tit. 19 § 427.5