Current through Register Vol. 46, No. 43, October 23, 2024
Section 895.5 - Requirements for construction of cable television plant and provision of cable television services(a) Definitions.(1) Primary service area shall include each of the following within the franchised area: (i) those areas where cable television plant has been built without a contribution-in-aid-of-construction by subscribers;(ii) those areas where the cable television company is obligated by the terms of its franchise to provide cable television service without a contribution-in- aid-of-construction by subscribers;(iii) any area adjoining an area described in subparagraph (i) or (ii) of this paragraph and which contains dwelling units at a minimum rate of 35 dwelling units per linear mile of aerial cable;(iv) any area adjoining an area described in subparagraphs (i) and (ii) of this paragraph and which contains at least the same number of dwelling units per linear mile of aerial cable as is the average number of dwelling units per linear mile of cable in areas described in subparagraphs (i) and (ii) of this paragraph. The average is to be determined by dividing the sum of the dwelling units in areas described in subparagraphs (i) and (ii) of this paragraph by the number of linear miles of cable in the same areas.(2) Line extension area shall be any area within the franchised area which is not the primary service area.(b) Where a cable television franchise is awarded, renewed or amended after October 1, 1982, the franchise will be confirmed or the amendment will be approved by the commission only if the franchise contains the following additional minimum franchise standards: (1) That, within five years after receipt of all necessary operating authorizations, cable television service will be offered throughout the authorized area to all subscribers requesting service in any primary service area.(2) That cable television service will not be denied to potential subscribers located in line extension areas who are willing to contribute to the cost of construction in accordance with the following formula: C equals the cost of construction of new plant; CA equals the average cost of construction per mile in the primary service area; P equals the lower of 35 or the average number of dwelling units per linear mile of cable in areas described in subparagraphs (a)(1)(i) and (ii) of this section; LE equals the number of dwelling units requesting service in the line extension area; and SC equals subscriber contribution-in-aid-of-construction in the line extension area.
(i) Whenever a potential subscriber located in a line extension area requests service, the cable television company shall, within 30 days of the request, conduct a survey to determine the number of potential subscribers located in the line extension area, and shall inform each of the potential subscribers of the contribution-in-aid-of-construction that may be charged. The cable television company may require prepayment of the contribution-in-aid-of-construction. The cable television company shall apply for pole attachment agreements within 30 days of its receipt of the contribution-in-aid-of construction. Cable television services must be made available to those who made a contribution-in-aid-of-construction within 90 days from the receipt of pole attachment agreements by the cable television company.(ii) The contribution-in-aid-of-construction shall be in addition to the installation rate set forth in the franchise.(iii) During a five-year period commencing at the completion of a particular line extension, pro rata refund shall be paid to previous subscribers as new subscribers are added to the particular line extension; the amount of the refund, if any, shall be determined by application of the formula annually. The refunds shall be paid annually to subscribers, or former subscribers, entitled to receive them. The company shall not be required to provide refunds to any previous subscriber otherwise entitled to a refund, who is no longer at the same address and who has not informed the company of the subscriber's address.(3) That cable television service will be provided to any subscriber who demands service within seven business days of the request for service and who is located within 150 feet of aerial feeder cable, and that the charge for the installation for any subscriber so situated will not be in excess of the standard installation charge.(4) Nothing in paragraph (1) of this subdivision shall be construed to preclude: (i) the provision of cable television services by the franchisee in a line extension area without assessing a contribution-in-aid-of-construction; or(ii) the inclusion in a cable television franchise of a provision establishing a primary service area which includes at least all of those areas which are in the primary service area as defined in subdivision (a) of this section.(5) Nothing in paragraph (2) of this subdivision shall be construed to preclude: (i) the discounting or the waiver of the maximum contribution-in-aid-of-construction charge a cable television company can charge a subscriber pursuant to paragraph (2) of this subdivision; or(ii) the inclusion of a provision in a cable television franchise establishing a formula to be used to determine the contribution-in-aid-of-construction charge, which formula is different than the formula set forth in paragraph (2) of this subdivision, provided that the formula included in the franchise does not require payment by the subscriber in a line extension area of a higher contribution-in-aid-of-construction charge than would result from the use of the formula set forth in paragraph (2) of this subdivision.(c) All cable television companies operating in the State of New York shall make cable television service available to all potential subscribers requesting service who are located in a primary service area as defined in paragraph (a)(1) of this section, and shall make services available in line extension areas as defined in paragraph (a)(2) of this section at charges which may not exceed those provided for in paragraph (b)(2) of this section within the following schedule of compliance:(1) prior to January 1, 1984 in any franchise area for which the original certificate of confirmation of the franchise was granted by this commission prior to January 1, 1979;(2) within five years from the date the certificate of confirmation was granted by this commission, in any franchise area for which the original certificate of confirmation of the franchise was granted by this commission after January 1, 1979.(d) The provisions of this section may be waived by the commission if the commission determines that compliance with the section would not be possible within the limitations of economic feasibility.N.Y. Comp. Codes R. & Regs. Tit. 16 § 895.5