N.Y. Comp. Codes R. & Regs. tit. 16 § 258.13

Current through Register Vol. 46, No. 45, November 2, 2024
Section 258.13 - Report of specifications for proposed construction
(a) The following maps, sketches, and drawings shall be filed with and as a part of the report of specifications:
(1) three sets of current U.S. Geological Survey Maps (71/2 or 15 minute) clearly indicating the entire route of the proposed construction or reconstruction and an area of one mile on either side of the route; and
(2) three sets of strip maps and design drawings showing details of the proposed construction or reconstruction.
(b) A report of specifications identical in format with subdivision (c) of this section shall be submitted in triplicate. Where additional space is necessary, supply the requested information on attached sheets.
(c)

STATE OF NEW YORK

DEPARTMENT OF PUBLIC SERVICE

REPORT OF SPECIFICATIONS FOR PROPOSED CONSTRUCTION

LIQUID PETROLEUM PIPELINE FACILITIES

General Information

1. Corporation name ____________ Date ________

2. Pipeline route:

From ____________

To ____________

3. Length ____________

4. New construction or reconstruction ____________

5. Counties traversed ____________

6. Towns traversed ____________

7. Cities traversed ____________

8. Villages traversed ____________

9. Estimated starting date ____________

10. Estimated completion date ____________

11. Pipeline identification name or number ____________

Pipe Specifications

1. Nominal outside diameter, D (inches) ____________

2. Nominal wall thickness, t (inches) ____________

3. Type and/or grade of pipe ____________

4. Manufacturer of steel ____________

5. Manufacturer of pipe ____________

6. Longitudinal joint type ____________

7. Specified minimum yield strength, SMYS (psi) ____________

8. Nominal ultimate strength (psi) ____________

9. Fracture toughness (minimum Charpy Energy in ft. lbs. at 20° F for buried pipe, -20° F for exposed pipe) ____________

10. Mill test pressure (psi) ____________

11. Is pipe new or used ____________

12. If used pipe is employed, describe inspection and reconditioning procedures ____________

____________

13. Are the physical and chemical specifications of pipe to be verified by outside laboratories? If yes, by whom? ____________ ____________

Operating Pressure and Stress

1. Maximum operating pressure, P (psi) ____________

2. Calculated pipe stress (hoop stress) = PD/2t (psi) ____________

3. Ratio of pipe stress to SMYS (percent) ____________

Welding

1. Percentage of welds to be radiographed, by location ____________

____________

2. How will the corporation certify the radiographic technician ____________

____________

____________

Railroad, Road, and Water Crossings

1. Railroad and road crossings:

Attach a list giving the location of each and indicating whether each is cased or uncased (if uncased, provide reason), and if heavier wall carrier pipe is used.

2. Lake, river, stream, or creek crossings:

Attach a list giving the location of each and describing any special construction precautions to be followed.

3. Pipeline encroachments:

Attach a list of any encroachments to railroads or roads, by location, and describe any special construction precautions to be followed.

Valves (see 49 CFR 195.260)

1. Number and spacing of manual sectionalizing valves ____________

____________

2. Type, make, and location of any automatic valves to be used

____________

____________

Minimum Cover and Clearance (see 49 CFR 195.248, 250)

If the minimum prescribed cover and/or clearance cannot be maintained, indicate the location, nature of problem, cover and/or clearance to be maintained, and any special precautions to be observed. Corrosion Control (see 49 CFR 195.242)

1. Type of field coating:

For pipe (if not factory coated) ____________

For welds and fittings ____________

2. Type of coating test:

Before backfill ____________

After backfill ____________

3. Type of cathodic protection system

____________

Pressure and Leakage Tests (see section 258.6 of this Part)

1. Test pressure ____________

2. Test medium ____________

3. Test duration ____________

4. Length of test section(s) ____________

Right-of-Way

1. Has necessary right-of-way been obtained from each party having interest in the right-of-way? If not, what is the status?

2. Have formal approval and all necessary permits been obtained from governmental agencies? If not, what is the status?

Products Transported

Pipeline certified to transport the following liquid petroleum products:

1. ____________

2. ____________

3. ____________

4. ____________

5. ____________

______________

Signature of corporation officer

______________

Title

N.Y. Comp. Codes R. & Regs. Tit. 16 § 258.13