Current through Register Vol. 46, No. 45, November 2, 2024
Section 255.1009 - Required report when compression couplings fail(a) Except as provided in subdivision (b) of this section, each operator of a distribution pipeline system must submit a report on each mechanical fitting failure, excluding any failure that results only in a nonhazardous leak, on a Department of Transportation form PHMSA F-7100.1-2. The report(s) must be submitted in accordance with 49 CFR 191.12.(b) The mechanical fitting failure reporting requirements in subdivision (a) of this section do not apply to the following: (1) master meter operators;(2) small LPG operator as defined in section 255.1001 of this Part; orN.Y. Comp. Codes R. & Regs. Tit. 16 § 255.1009