Current through Register Vol. 46, No. 45, November 2, 2024
Section 255.376 - Installation of plastic service lines by trenchless excavationPlastic service lines installed by trenchless excavation must comply with the following:
(a) Each operator shall take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities or structures at the time of installations.(b) For each pipeline section, plastic pipe and components that are pulled through the ground must use a weak link, as defined by section 255.3 of this Part, to ensure the pipeline will not be damaged by any excessive forces during the pulling process.N.Y. Comp. Codes R. & Regs. Tit. 16 § 255.376