N.Y. Comp. Codes R. & Regs. Tit. 12 §§ 56-4.8

Current through Register Vol. 46, No. 50, December 11, 2024
Section 56-4.8 - Area air sample analysis and results-general requirements
(a) Turnaround time. For project air samples collected during the asbestos project, the period of time permitted between completion of air sample collection and receipt of results on the job site shall be equal to or less than 48 hours.
(b) Microscope detail. The methodology chosen for sampling, analysis, and the microscope type, make, and model number shall be included in the results.
(c) Sample records. All project air samples shall have a chain of custody.

N.Y. Comp. Codes R. & Regs. Tit. 12 §§ 56-4.8