After all regulated abatement work areas for the asbestos project have been dismantled as per section 56-9.3 of this Part, any remaining remote decontamination enclosures must be dismantled and removed from the work site. All plastic sheeting shall be removed and disposed of as asbestos waste.
N.Y. Comp. Codes R. & Regs. Tit. 12 §§ 56-10.3