Section 4-4.2 - Preparation of boiler for inspection

A boiler shall be properly prepared for internal inspection or hydrostatic pressure tests by the owner on a date specified by the inspector. Such inspection or test shall be made on not less than 15 days' notice, unless the owner agrees to a shorter notice. Unless the inspector advises to the contrary, the owner shall prepare a boiler for internal inspection in the following manner:

(a) Water shall be drawn off and the boiler thoroughly washed.
(b) All manhole and handhole plates and washout plugs in the water column connection shall be removed and the furnace and combustion chambers thoroughly cooled and cleaned.
(c) All grates of internally fired boilers shall be removed.
(d) At each inspection, brick work and insulation shall be removed as required by the inspector.
(e) The steam gage shall be removed for testing when there is evidence that its operation has been inaccurate and faulty.
(f) All leaks of steam or hot water into the boiler shall be stopped.