Current through Register Vol. 35, No. 23, December 10, 2024
Section 8.370.18.20 - NEW FACILITYA. A new facility may be opened in an existing building or a newly constructed building. If opened in an existing building a variance may be granted for those building requirements the facility cannot meet under the same criteria outlined in Subsections A, B and C of 8.370.18.19 NMAC of these regulations, if not in conflict with existing building and fire codes. This is at the sole discretion of the licensing authority.B. A new facility opened in a newly constructed building must meet all requirements of these regulations.N.M. Admin. Code § 8.370.18.20
Adopted by New Mexico Register, Volume XXXV, Issue 12, June 25, 2024, eff. 7/1/2024