No later than 60 days before a permit review is required by Section 74-9-24 of the Solid Waste Act, the owner or operator shall submit to the department a complete description of the following:
N.M. Admin. Code § 20.9.3.24
No later than 60 days before a permit review is required by Section 74-9-24 of the Solid Waste Act, the owner or operator shall submit to the department a complete description of the following:
N.M. Admin. Code § 20.9.3.24