Current through Register Vol. 35, No. 23, December 10, 2024
Section 20.9.3.10 - ADDITIONAL PERMIT APPLICATION REQUIREMENTS FOR CONSTRUCTION AND DEMOLITION LANDFILLSAny person seeking a permit for a construction and demolition landfill shall submit the following information in addition to that required under 20.9.3.8 NMAC:
A. site plans and cross-sections of the proposed facility, drawn to scale, indicating the location of: (3) entrances, exits and access roads;(4) locations of buildings within 500 feet of the facility;(5) public water supply wells and private wells within 1000 feet of the facility; and,(6) borrow and fill areas;B. frequency of construction and demolition debris disposal; andC. if recycling operations are conducted, the method of diversion and storage of the recyclable materials, the frequency of collection for reuse from the facility, method of transport, and destination; the recycling operation shall comply with 20.9.3.29 NMAC.N.M. Admin. Code § 20.9.3.10
20.9.3.10 NMAC - Rp, 20 NMAC 9.1.II.203, 08/02/07