Current through Register Vol. 35, No. 21, November 5, 2024
Section 20.9.20.49 - ANNUAL REPORTS AND FINAL REPORTSAny person having a tire recycling facility permit, civil engineering application permit or scrap tire hauler registration shall submit an annual report to the secretary within 60 days after the end of each calendar year describing the operations of the past year.
A. For tire recycling facilities, the report shall include the following information:(1) the type of processing;(2) the number of scrap tires or weight of the scrap tires received annually from each scrap tire generator or scrap tire hauler;(3) the name, mailing address, contact name, telephone number and e-mail address if available, of each transporter that delivered scrap tires to the facility;(4) the name, mailing address, contact name, telephone number and e-mail address if available, where the scrap tires originated;(5) the number of unprocessed scrap tire remaining at the site at the end of the calendar year;(6) the number of processed scrap tire remaining at the site at the end of the calendar year; and(7) the number of tire bales, if applicable, remaining at the site at the end of the calendar year.B. For scrap tire haulers, the report shall include the following information: (1) the number of scrap tires or weight of the scrap tires for each month, by origin and destination;(2) the name, mailing address, contact name, telephone number and e-mail address if available, of each scrap tire generator or scrap tire hauler; and(3) the name, mailing address, contact name, telephone number and e-mail address if available, of each authorized facility where scrap tires are delivered.C. For civil engineering projects taking more than one year, the report shall include the following information: (1) the number of scrap tires or weight of the scrap tires received from each scrap tire generator or scrap tire hauler;(2) the name, mailing address, contact name, telephone number and e-mail address if available, of each scrap tire generator or scrap tire hauler;(3) the name, mailing address, contact name, telephone number and e-mail address if available, where the scrap tires originated; and(4) the status of the civil engineering application to include the number of scrap tires or weight of scrap tires that have not been used for the project yet, the number that is still needed, and the portion of the project that has already been completed.D. For civil engineering projects taking less than one year, the report shall be submitted to the department 30 days after completion and shall include: (1) as built drawings including cross section and plan view, if different from the proposed design; if the civil engineering application used 100,000 scrap tires or more or is more than two scrap tire bales high, the as built shall be signed and sealed by a professional engineer registered in New Mexico;(2) the total number of scrap tires or tire bales used for the civil engineering application;(3) the length, width and height of the civil engineering application; and(4) photographs of the civil engineering application.N.M. Admin. Code § 20.9.20.49
20.9.20.49 NMAC - Rp, 20 NMAC 9.2.III.301, 8/2/2007