N.M. Admin. Code § 20.7.11.9

Current through Register Vol. 35, No. 23, December 10, 2024
Section 20.7.11.9 - QUALIFICATION CERTIFICATE FEES

If a qualification certificate is requested as provided for in 20.7.3.904 NMAC, a fee as indicated in subsections A through F of this section shall be submitted upon issuance of the qualification certificate in addition to any associated permit fee required in 20.7.11 NMAC. The fee for a qualification certificate for:

A. a qualified homeowner is $170.00;
B. a third-party evaluator is $50.00;
C. a maintenance service provider is $50.00;
D. a septage pumper is $30.00;
E. an installer specialist is $150.00;
F. renewal for an installer specialist is $75.00

N.M. Admin. Code § 20.7.11.9

Adopted by New Mexico Register, Volume XXXI, Issue 07, April 7, 2020, eff. 7/1/2020