N.M. Admin. Code § 20.6.4.206

Current through Register Vol. 35, No. 23, December 10, 2024
Section 20.6.4.206 - PECOS RIVER BASIN

Perennial reaches of the Rio Felix and perennial reaches of tributaries to the Rio Hondo downstream of Bonney canyon, excluding North Spring river.

A.Designated uses: irrigation, livestock watering, wildlife habitat, secondary contact and warmwater aquatic life.
B.Criteria:
(1) The use-specific numeric criteria set forth in 20.6.4.900 NMAC are applicable to the designated uses.
(2) At all flows above 50 cfs: TDS 14,000 mg/L or less, sulfate 3,000 mg/L or less and chloride 6,000 mg/L or less.

N.M. Admin. Code § 20.6.4.206

20.6.4.206 NMAC - Rp 20 NMAC 6.1.2206, 10-12-00; A, 05-23-05; A, 12-01-10, Amended by New Mexico Register, Volume XXVIII, Issue 02, January 31, 2017, eff. 3/2/2017, Amended by New Mexico Register, Volume XXXIII, Issue 07, April 5, 2022, eff. 4/23/2022