N.M. Admin. Code § 20.6.2.5356

Current through Register Vol. 35, No. 23, December 10, 2024
Section 20.6.2.5356 - LOGGING, SAMPLING, AND TESTING PRIOR TO NEW WELL OPERATION
A. During the drilling and construction of a new Class I hazardous waste injection well, appropriate logs and tests shall be run to determine or verify the depth, thickness, porosity, permeability, and rock type of, and the salinity of any entrained fluids in, all relevant geologic units to assure conformance with performance standards in 20.6.2.5355 NMAC, and to establish accurate baseline data against which future measurements may be compared. A descriptive report interpreting results of such logs and tests shall be prepared by a knowledgeable log analyst and submitted to the director. At a minimum, such logs and tests shall include:
(1) deviation checks during drilling on all holes constructed by drilling pilot holes which are enlarged by reaming or another method; such checks shall be at sufficiently frequent intervals to determine the location of the borehole and to assure that vertical avenues for fluid movement in the form of diverging holes are not created during drilling; and
(2) such other logs and tests as may be needed after taking into account the availability of similar data in the area of the drilling site, the construction plan, and the need for additional information that may arise from time to time as the construction of the well progresses; at a minimum, the following logs shall be required in the following situations:
(a) upon installation of the surface casing:
(i) resistivity, spontaneous potential, and caliper logs before the casing is installed; and
(ii) a cement bond and variable density log, and a temperature log after the casing is set and cemented;
(b) upon installation of the long string casing:
(i) resistivity, spontaneous potential, porosity, caliper, gamma ray, and fracture finder logs before the casing is installed; and
(ii) a cement bond and variable density log, and a temperature log after the casing is set and cemented;
(c) the director may allow the use of an alternative to the above logs when an alternative will provide equivalent or better information; and
(3) a mechanical integrity test consisting of:
(a) a pressure test with liquid or gas;
(b) a radioactive tracer survey;
(c) a temperature or noise log;
(d) a casing inspection log, if required by the director; and
(e) any other test required by the director.
B. Whole cores or sidewall cores of the confining and injection zones and formation fluid samples from the injection zone shall be taken. The director may accept cores from nearby wells if the owner or operator can demonstrate that core retrieval is not possible and that such cores are representative of conditions at the well. The director may require the owner or operator to core other formations in the borehole.
C. The fluid temperature, pH, conductivity, pressure and the static fluid level of the injection zone must be recorded.
D. At a minimum, the following information concerning the injection and confining zones shall be determined or calculated for Class I hazardous waste injection wells:
(1) fracture pressure;
(2) other physical and chemical characteristics of the injection and confining zones; and
(3) physical and chemical characteristics of the formation fluids in the injection zone.
E. Upon completion, but prior to operation, the owner or operator shall conduct the following tests to verify hydrogeologic characteristics of the injection zone:
(1) a pump test; or
(2) injectivity tests.
F. The director shall have the opportunity to witness all logging and testing required by 20.6.2.5351 through 20.6.2.5363 NMAC. The owner or operator shall submit a schedule of such activities to the director 30 days prior to conducting the first test.

N.M. Admin. Code § 20.6.2.5356

Adopted by New Mexico Register, Volume XXVI, Issue 15, August 14, 2015, eff. 8/31/2015