N.M. Admin. Code § 20.6.2.5003

Current through Register Vol. 35, No. 23, December 10, 2024
Section 20.6.2.5003 - NOTIFICATION AND GENERAL OPERATION REQUIREMENTS FOR ALL UNDERGROUND INJECTION CONTROL WELLS

All operators of underground injection control wells, except those wells regulated under the Oil and Gas Act, the Geothermal Resources Development Act, and the Surface Mining Act, shall:

A. for existing underground injection control wells, submit to the secretary the information enumerated in Subsection C of 20.6.2.1201 NMAC of this part; provided, however, that if the information in Subsection C of 20.6.2.1201 NMAC has been previously submitted to the secretary and acknowledged by him, the information need not be resubmitted; and
B. operate and continue to operate in conformance with 20.6.2.1 through 20.6.2.5399 NMAC;
C. for new underground injection control wells, submit to the secretary the information enumerated in Subsection C of 20.6.2.1201 NMAC of this part at least 120 days prior to well construction.

N.M. Admin. Code § 20.6.2.5003

9-20-82, 12-1-95; 20.6.2.5300 NMAC - Rn, 20 NMAC 6.2.V.5300, 1-15-01; 20.6.2.5003 NMAC - Rn, 20.6.2.5300 NMAC, 12-1-01; A, 12-1-01; A, 9-15-02, Amended by New Mexico Register, Volume XXVI, Issue 15, August 14, 2015, eff. 8/31/2015, Amended by New Mexico Register, Volume XXIX, Issue 23, December 11, 2018, eff. 12/21/2018