N.M. Admin. Code § 20.6.2.3114

Current through Register Vol. 35, No. 23, December 10, 2024
Section 20.6.2.3114 - FEES
A. FEE AMOUNT AND SCHEDULE OF PAYMENT - Every facility submitting a discharge permit application for approval or renewal shall pay the permit fees specified in Table 1 of this section and shall pay a filing fee as specified in Table 2 of this section to the Water Quality Management Fund. Every facility submitting a request for temporary permission to discharge pursuant to Subsection B of Section 20.6.2.3106 NMAC, or financial assurance pursuant to Paragraph 11 of Subsection A of Section 20.6.2.3107 NMAC shall pay the fees specified in Table 2 of this section to the Water Quality Management Fund.
B. Facilities applying for discharge permits which are subsequently withdrawn or denied shall pay one-half of the permit fee at the time of denial or withdrawal.
C. Every facility submitting an application for discharge permit modification will be assessed a filing fee plus one-half of the permit fee. Applications for both renewal and modification will pay the filing fee plus the permit fee.
D. If the secretary requires a discharge permit modification as a component of an enforcement action, the facility shall pay the applicable discharge permit modification fee. If the secretary requires a discharge permit modification outside the context of an enforcement action, the facility shall not be assessed a fee.
E. The secretary may waive or reduce fees for discharge permit modifications or renewals which require little or no cost for investigation or issuance.
F. Facilities shall pay the filing fee at the time of discharge permit application. The filing fee is nonrefundable. The required permit fees may be paid in a single payment at the time of discharge permit approval or in equal installments over the term of the discharge permit. Installment payments shall be remitted yearly, with the first installment due on the date of discharge permit approval. Subsequent installment payments shall be remitted yearly thereafter. The discharge permit or discharge permit application review of any facility shall be suspended or terminated if the facility fails to submit an installment payment by its due date.
G. Every three years beginning in 2004, the department shall review the fees specified in Table 1 and 2 of this section and shall provide a report to the commission. The department shall revise the fees as necessary in accordance with Section 74-6-5(J), NMSA 1978.

20.6.2.3114 TABLE 1 (gpd=gallons per day)

Permit Fee

Agriculture <10,000 gpd

$ 1,150

Agriculture 10,000 to 49,999 gpd

$ 2,300

Agriculture 50,000 to 99,999 gpd

$ 3,450

Agriculture 100,000 gpd or greater

$ 4,600

Domestic Waste <10,000 gpd

$ 1,150

Domestic Waste 10,000 to 49,999 gpd

$ 2,300

Domestic Waste 50,000 to 99,999 gpd

$ 3,450

Domestic Waste 100,000 to 999,999 gpd

$ 4,600

Domestic Waste 1,000,000 to 9,999,999 gpd

$ 7,000

Domestic Waste 10,000,000 gpd or greater

$ 9,200

Food Processing <10,000 gpd

$ 1,150

Food Processing 10,000 to 49,999 gpd

$ 2,300

Food Processing 50,000 to 99,999 gpd

$ 3,450

Food Processing 100,000 to 999,999 gpd

$ 4,600

Food Processing 1,000,000 or greater

$ 7,000

Grease/Septage surface disposal <10,000 gpd

$ 1,725

Grease/Septage surface disposal 10,000 gpd or greater

$ 3,450

Industrial <10,000 gpd; or <10,000 yd3 of contaminated solids

$ 1,725

Industrial 10,000 to 99,999 gpd; or 10,000 to 99,999 yd3 of contaminated solids

$ 3,450

Industrial 100,000 to 999,999 gpd; or 100,000 to 999,999 yd3 of contaminated solids or greater

$ 6,900

Industrial 1,000,000 gpd or greater; or 1,000,000 yd3 of contaminated solids or greater

$10,350

Discharge of remediation system effluent - remediation plan approved under separate regulatory authority

$ 1,600

Mining dewatering

$ 3,250

Mining leach dump

$13,000

Mining tailings

$13,000

Mining waste rock

$13,000

Mining in-situ leach (except salt) and old stope leaching

$13,000

Mining other (mines with minimal environmental impact, post closure operation and maintenance, evaporation lagoons and land application at uranium mines)

$ 4,750

Gas Compressor Stations 0 to 1000 Horsepower

$ 400

Gas Compressor Stations >1001 Horsepower

$ 1,700

Gas Processing Plants

$ 4,000

Injection Wells: Class I (non-hazardous)

$ 4,500

Injection Wells: Class III and Geothermal

$ 1,700

Oil and Gas Service Companies

$ 1,700

Refineries

$ 8,400

Crude Pump Station

$ 1,200

Underground Gas Storage

$ 1,700

Abatement of ground water and vadose zone contamination

$ 2,600

General permit

$ 600

20.6.2.3114 Table 2

Fee Amount

Filing fee

$100

Temporary permission

$50

Financial assurance: approval of instrument

greater of $250 or .01%

Financial assurance: annual review

greater of $100 or .001%

N.M. Admin. Code § 20.6.2.3114

8-17-91, 12-1-95; 20.6.2.3114, Rn & A, 20 NMAC 6.2.III.3114, 01-01-01, Amended by New Mexico Register, Volume XXIX, Issue 23, December 11, 2018, eff. 12/21/2018