Current through Register Vol. 35, No. 21, November 5, 2024
Section 20.6.2.3108 - PUBLIC NOTICE AND PARTICIPATIONA. Within 15 days of receipt of an application for a discharge permit, modification or renewal, the department shall review the application for administrative completeness. To be deemed administratively complete, an application shall provide all of the information required by Paragraphs (1) through (5) of Subsection F of 20.6.2.3108 NMAC and shall indicate, for department approval, the proposed locations and newspaper for providing notice required by Paragraphs (1) and (4) of Subsection B or Paragraph (2) of Subsection C of 20.6.2.3108 NMAC. The department shall notify the applicant in writing when the application is deemed administratively complete. If the department determines that the application is not administratively complete, the department shall notify the applicant of the deficiencies in writing within 30 days of receipt of the application and state what additional information is necessary.B. Within 30 days of the department deeming an application for discharge permit or discharge permit modification administratively complete, the applicant shall provide notice, in accordance with the requirements of Subsection F of 20.6.2.3108 NMAC, to the general public in the locale of the proposed discharge in a form provided by the department by each of the methods listed below: (1) for each 640 contiguous acres or less of a discharge site, prominently posting a synopsis of the public notice at least 2 feet by 3 feet in size, in English and in Spanish, at a place conspicuous to the public, approved by the department, at or near the proposed facility for 30 days; one additional notice, in a form approved by and may be provided by the department, shall be posted at a place located off the discharge site, at a place conspicuous to the public and approved by the department; the department may require a second posting location for more than 640 contiguous acres or when the discharge site is not located on contiguous properties;(2) providing written notice of the discharge by mail or electronic mail, to owners of record of all properties within a 1/3 mile distance from the boundary of the property where the discharge site is located; if there are no properties other than properties owned by the discharger within a 1/3 mile distance from the boundary of property where the discharge site is located, the applicant shall provide notice to owners of record of the next nearest adjacent properties not owned by the discharger;(3) providing notice by certified mail, return receipt requested, to the owner of the discharge site if the applicant is not the owner; and(4) publishing a synopsis of the notice in English and in Spanish, in a display ad at least three inches by four inches not in the classified or legal advertisements section, in a newspaper of general circulation in the location of the proposed discharge.C. Within 30 days of the department deeming an application for discharge permit renewal administratively complete, the applicant shall provide notice, in accordance with the requirements of Subsection F of 20.6.2.3108 NMAC, to the general public in the locale of the proposed discharge in a form provided by the department by each of the methods listed below: (1) providing notice by certified mail to the owner of the discharge site if the applicant is not the owner; and(2) publishing a synopsis of the notice, in English and in Spanish, in a display ad at least two inches by three inches, not in the classified or legal advertisements section, in a newspaper of general circulation in the location of the discharge.D. Within 15 days of completion of the public notice requirements in Subsections B or C of 20.6.2.3108 NMAC, the applicant shall submit to the department proof of notice, including an affidavit of mailing(s) and the list of property owner(s), proof of publication, and an affidavit of posting, as appropriate.E. Within 30 days of determining an application for a discharge permit, modification or renewal is administratively complete, the department shall post a notice on its website and shall mail notice to any affected local, state, federal, tribal or pueblo governmental agency, political subdivisions, ditch associations and land grants, as identified by the department. The department shall also mail or e-mail notice to those persons on a general and facility-specific list maintained by the department who have requested notice of discharge permit applications. The notice shall include the information listed in Subsection F of 20.6.2.3108 NMAC.F. The notice provided under Subsection B, C and E of 20.6.2.3108 NMAC shallinclude: (1) the name and address of the proposed discharger;(2) the location of the discharge, including a street address, if available, and sufficient information to locate the facility with respect to surrounding landmarks;(3) a brief description of the activities that produce the discharge described in the application;(4) a brief description of the expected quality and volume of the discharge;(5) the depth to and total dissolved solids concentration of the ground water most likely to be affected by the discharge;(6) the address and phone number within the department by which interested persons may obtain information, submit comments, and request to be placed on a facility-specific mailing list for future notices; and(7) a statement that the department will accept comments and statements of interest regarding the application and will create a facility-specific mailing list for persons who wish to receive future notices.G. All persons who submit comments or statements of interest to the department or previously participated in a public hearing and who provide a mail or e-mail address shall be placed on a facility-specific mailing list and the department shall send those persons the public notice issued pursuant to Subsection J of 20.6.2.3108 NMAC, and notice of any public meeting or hearing scheduled on the application. All persons who contact the department to inquire about a specific facility shall be informed of the opportunity to be placed on the facility-specific mailing list.H. Within 60 days after the department makes its administrative completeness determination and all required technical information is available, the department shall make available a draft permit or a notice of intent to deny an application for a discharge permit, modification or renewal. The draft permit shall include all proposed effluent limitations or other conditions on proposed discharge, and all proposed monitoring, recordkeeping, and reporting requirements. A draft permit for a permit modification shall only include those permit conditions proposed to be modified.I. The department shall prepare a fact sheet for every draft permit for a discharge at a federal facility, except for discharges comprised solely of domestic liquid waste, and for other draft permits as determined by the Secretary. The fact sheet shall include:(1) the information in Paragraphs 1 - 4 of Subsection F of 20.6.2.3108 NMAC;(2) the information in Subsection J of 20.6.2.3108 NMAC; and (3) a brief summary of the basis for the draft permit conditions, including references to applicable statutory or regulatory provisions and appropriate supporting references to the administrative record.J. The department shall mail by certified mail a copy of the draft permit and fact sheet or notice of intent to deny to the applicant and shall provide notice of the draft permit or the notice of intent to deny by:(1) posting on the department's website;(2) publishing notice in a newspaper of general circulation in this state and a newspaper of general circulation in the location of the facility;(3) mailing or e-mailing to those persons on a facility-specific mailing list;(4) mailing to any affected local, state, or federal governmental agency, ditch associations and land grants, as identified by the department; and(5) mailing to the governor, chairperson, or president of each Indian tribe, pueblo or nation within the state of New Mexico, as identified by the department.K. The public notice issued under Subsection H shall include the information in Subsection F of 20.6.2.3108 NMAC and the following information: (1) a brief description of the procedures to be followed by the secretary in making a final determination;(2) a statement of the comment period and description of the procedures for a person to request a hearing on the application; and(3) the address, telephone number, and email address at which interested persons may obtain a copy of the draft permit and fact sheet or the notice of intent to deny.L. In the event that the draft permit or notice of intent to deny is available for review within 30 days of deeming the application administratively complete, the department may combine the public notice procedures of Subsections E and H of 20.6.2.3108 NMAC.M. Following the public notice of the draft permit or notice of intent to deny, and prior to a final decision by the secretary, there shall be a period of at least 30 days during which written comments may be submitted to the department and/or a public hearing may be requested in writing. The 30-day comment period shall begin on the date of publication of notice in the newspaper. All comments will be considered by the department. Requests for a hearing shall be in writing and shall set forth the reasons why a hearing should be held. A public hearing shall be held if the secretary determines there is substantial public interest. The department shall notify the applicant and any person requesting a hearing of the decision whether to hold a hearing and the reasons therefore in writing.N. If a hearing is held, pursuant to Subsection M of 20.6.2.3108 NMAC, notice of the hearing shall be given by the department at least 30 days prior to the hearing in accordance with Subsection H of 20.6.2.3108 NMAC. The notice shall include the information identified in Subsection F of 20.6.2.3108 NMAC in addition to the time and place of the hearing and a brief description of the hearing procedures. The hearing shall be held pursuant to 20.6.2.3110 NMAC.N.M. Admin. Code § 20.6.2.3108
2-18-77, 12-24-87, 12-1-95, 11-15-96; 20.6.2.3108 NMAC - Rn, 20 NMAC 6.2.III.3108, 1-15-01; A, 12-1-01; A, 9-15-02; A, 7-16-06, Amended by New Mexico Register, Volume XXIX, Issue 23, December 11, 2018, eff. 12/21/2018