ACTION | # OF POINTS | |
1. CONSTRUCTION PERMIT/TECHNICAL REVIEW OF EXISTING PERMIT | ||
Technical Complexity | ||
1-5 Fee Units | 5 | |
6-15 Fee Units | 1 | point per fee unit |
15 Fee Units | 15 | |
Fugitive Emissions Fee Unit | 5 | |
Portable Source Relocation | 1 | |
(Paragraph 3 of Subsection D of 20.2.72.202 NMAC) | ||
Non-Attainment Area (20.2.79 NMAC) | 75 | |
Modeling Review | 15 | |
Air Toxics Review (20.2.72.400 NMAC - 20.2.72.499 NMAC) | ||
Level I | 8 | |
Level II | ||
Best Available Control Technology (BACT) Analysis | 60 | |
Health Assessment | 100 | |
Applicable Regulations | ||
20.2.X NMAC (per each) | 3 | |
NSPS (per each) | 5 | |
NESHAP/MACT (per each) | 5 | |
Case-by-Case MACT (20.2.83 NMAC) | 100 | |
PSD netting only (no additional PSD analysis is required) | 20 | |
PSD review (including netting) (20.2.74 NMAC) | 75 | |
2. OTHER PERMITTING ACTIONS | ||
General Permits (20.2.72.220 NMAC) | 10 | |
Streamline (each site) (20.2.72.300 NMAC- 20.2.72.399 NMAC) | 10 |
N.M. Admin. Code § 20.2.75.11