Current through Register Vol. 35, No. 21, November 5, 2024
Section 20.2.72.302 - CONTENTS OF APPLICATIONA. Any person seeking a permit under 20.2.72.300 NMAC - 20.2.72.399 NMAC shall do so by filing a written application with the Department. For those applications not qualifying under Subsection A of 20.2.72.303 NMAC, the applicant shall also: (1) Provide by certified mail a complete copy of the application and public notice to the Department's field or district office nearest the source; and(2) Provide by certified mail a copy of the public notice to the appropriate federal land manager if the source will locate within 50 km of the boundary of a Class I area.B. The items of this section, if requested on the applicable application form, are required before the Department may deem an application administratively complete. The applicant shall submit the number of copies of the permit application specified in the applicable application form. All applications shall be filed on the forms furnished by the Department and shall include: (1) The applicant's name and address, the person to contact regarding the application, and the name and address of the new source or modification;(2) A description of the new facility or modification including all operations effecting air emissions;(3) The anticipated operating schedule;(4) A topographical map, at least as detailed as a 7.5 minute United States Geological Survey Topographic Quadrangle, showing the exact location and geographical coordinates of the stationary source;(5) The Universal Transverse Mercator (UTM) horizontal and vertical coordinates for the facility;(6) A plot plan showing the location of emission units with respect to the plant's property boundaries and the dimensions of any buildings, terrain, or obstructions which may cause emissions to be downwashed;(7) A detailed description of any air pollution control device or method to be utilized, including the basis for the estimated control efficiency;(8) The stack and exhaust gas parameters for all emission points, including calculations and manufacturer's or supplier's data which documents the emission rates and exhaust gas parameters;(9) A comprehensive regulatory compliance review, including all pertinent data and calculations, for each applicable new source performance standard, such as 40 CFR 60, Subpart GG - Standards of Performance for Stationary Gas Turbines;(10) Documentation of the manufacturer's or supplier's recommended maintenance schedules and procedures for all air pollution control equipment;(11) A compliance demonstration based on US EPA approved modeling or analysis, including all pertinent calculations and computations, for all applicable requirements of 20.2.72.300 NMAC - 20.2.72.399 NMAC for any facility electing to obtain a permit under 20.2.72.300 NMAC - 20.2.72.399 NMAC;(12) Documentary proof that the requirements of Paragraphs 1 and 2 of Subsection A of 20.2.72.302 NMAC have been satisfied;(13) The notarized signature under oath or affirmation by the operator, the owner, or an authorized representative, certifying to the best of his or her knowledge the truth of all information submitted;(14) Payment of any fees which are specified in 20.2.75 NMAC (Construction Permit Fees) as payable at the time the application is submitted; and(15) Any other specifically identified relevant information as the Department may reasonably require.N.M. Admin. Code § 20.2.72.302