N.M. Admin. Code § 18.27.6.13

Current through Register Vol. 35, No. 24, December 23, 2024
Section 18.27.6.13 - EVALUATION PROCESS

Each MPO/RTPO will be evaluating and ranking projects based on the specific merits of the individual projects using the evaluation criteria specified in the call for projects.

N.M. Admin. Code § 18.27.6.13

Adopted by New Mexico Register, Volume XXX, Issue 13, July 16, 2019, eff. 7/16/2019, Amended by New Mexico Register, Volume XXXII, Issue 08, April 20, 2021, eff. 4/20/2021