N.M. Admin. Code § 17.7.2.11

Current through Register Vol. 35, No. 21, November 5, 2024
Section 17.7.2.11 - SELF-DIRECTED PROGRAM EXEMPTIONS FOR LARGE CUSTOMERS

The following criteria apply to utility exemptions to large customers for self-directed programs.

A. To receive approval for an exemption to paying seventy percent of the tariff rider, a large customer must demonstrate to the reasonable satisfaction of the utility or self-direct program administrator that it has exhausted all cost-effective energy efficiency measures at its facility.
B. Projects that have received rebates, financial or other program support from a utility are not eligible for an exemption.
C. Eligible expenditures must have a simple payback period of more than one year but less than seven years.
D. Large customers shall seek and receive approval for exemptions from the utility or a commission-approved self-direct administrator.
E. Large customers applying for an investor-owned electric utility bill exemption must meet the electricity consumption size criterion set forth in Subsection G of Section 62-17-4 NMSA 1978.
F. Large customers applying for a gas utility bill exemption must meet the gas consumption criterion set forth in Subsection G of Section 62-17-4 NMSA 1978.
G. The utility shall designate a qualified representative to review and approve, or disapprove, large customer requests for exemptions.
H. The commission may appoint a "commission-approved" self-direct program administrator to review and approve, or disapprove, large customer requests for exemptions.
I. Approvals or disapprovals by the utility representative or administrator shall be subject to commission review. Within 30 business days of the action, the utility representative or administrator shall file and serve notice of each self-direct program approval or disapproval with the commission, and on all interested parties. Notice of an appeal of a utility or administrator approval or disapproval of a large customer exemption request shall be filed with the commission within 30 calendar days of the approval or disapproval action by staff, the large customer or any interested party.
J. Self-direct program participants, or large customers seeking an exemption shall provide, to the public utility or the commission approved self-direct program administrator, access to all relevant engineering studies and documentation needed to verify energy saving of the project, and allow access to its site for reasonable inspections, at reasonable times. All records relevant to a self-direct program shall be maintained by the large customer for the duration of that program, which shall be evaluated in accordance with 17.7.2.15 NMAC, subject to appropriate protections for confidentiality.
K. Self-direct program participants, or large customers seeking exemption, shall submit qualified in-house or contracted engineering studies, and such other information as may be reasonably required by the utility or program administrator, to demonstrate qualification for self-direct program exemptions.
L. Large customers must respond to reasonable utility or administrator information requests and allow the utility or an administrator to perform necessary site visits.
M. The utility or administrator shall act in a timely manner on requests for self-direct program approval.
N. For investor-owned electric utilities, the equivalent amount of energy savings associated with a large customer's self-directed program will be accounted for in calculating its compliance with minimum required energy savings.
O. Large customer expenditures incurred to produce electric energy savings or electric demand savings are only eligible for an electric utility bill credit. Large customer expenditures incurred to produce natural gas energy savings or natural gas demand savings are only eligible for a gas utility bill credit. Large customer expenditures incurred to produce both electric and natural gas energy savings, both electric and natural gas demand savings or any combination of energy savings and demand savings for both electric and natural gas are eligible for both an electricity bill credit and a gas utility bill credit, provided that the same energy efficiency expenditures or load management expenditures cannot be accounted for twice.
P. Upon written request by the large customer, the information provided by large customers to the utility or program administrator, program evaluator or others shall remain confidential, except as otherwise ordered by the commission.

N.M. Admin. Code § 17.7.2.11

17.7.2.11 NMAC - Rp, 17.7.2.11 NMAC, 5-3-10, Adopted by New Mexico Register, Volume XXV, Issue 24, December 30, 2014, eff. 1/1/2015, Adopted by New Mexico Register, Volume XXVIII, Issue 18, September 26, 2017, eff. 9/26/2017