If the commission orders termination of the PGAC, the utility shall perform an annual reconciliation in accordance with the methodology prescribed in 17.10.640.13 NMAC for the period of time between the end of the period included in its last annual reconciliation report and the date of termination of the PGAC. The utility shall file with the commission a final reconciliation report consistent with the requirements of the annual reconciliation report under Subsection D of 17.10.640.13 NMAC and shall calculate and collect or refund a final reconciliation factor consistent with the requirements of Subsection E of 17.10.640.13 NMAC.
N.M. Admin. Code § 17.10.640.16