Current through Register Vol. 35, No. 21, November 5, 2024
Section 14.5.5.12 - ELECTRICAL PERMIT FEESThe fees in this section are used as a base for determining the total fee. The permit fee will be the sum of the individual items multiplied by 1.8 or $48.00/hr.
A. Residential. (1) 100 amp service or less, $25.00(2) Over 100 amp through 200 amp, $ 40.00(3) Over 200 amp through 320 amp, $ 55.00(4) Over 320 amp through 400 amp, $125.00(5) Over 400 amp, $200.00(6) Plan review, $40.00/hr. or fraction thereofB. Commercial. (1) 100 amp service or less, $ 25.00(2) Over 100 amp through 200 amp, $ 40.00(3) Over 200 amp through 400 amp, $125.00(4) Over 400 amp through 600 amp, $150.00(5) Over 600 amp through 800 amp, $200.00(6) Over 800 amp through 1,000 amp, $250.00(7) Over 1,000 amp through 2,000 amp, $350.00(8) Over 2,000 amp, $500.00C. Other. (1) Temporary power pole, $15.00(2) Mobile home service, $15.00(3) Customer-owned distribution (not including wiring of a structure)(b) Plus $3.33 x number of poles or $3.33 x per 100 feet of underground(4) Service change only, no outlets, $15.00 (5) Minimum inspection fee for any item not listed, $15.00N.M. Admin. Code § 14.5.5.12
14.5.5.12 NMAC - Rp, 14.5.5.8 NMAC, 7-1-04; A, 05-01-10