When a surveyor does surveying of a type not described in these standards, the surveyor shall do all that is necessary to fully determine and report all information which is relevant to the project. The scope of the project may be stated and limited. The surveyor shall not prepare or sign a document, which could mislead or misinform. If a surveyor issues a plat with the surveyor's signature and seal, which was not required by these minimum standards, the plat shall comply with the applicable portions of Subsection J of 12. 8.2.9 NMAC.
N.M. Admin. Code § 12.8.2.15