Current through Register Vol. 56, No. 21, November 4, 2024
Section 8:51-8.1 - Reinspection(a) Upon completion of abatement and/or interim controls work and prior to refinishing, the local board of health shall make a reinspection to determine if the hazard has been satisfactorily eliminated. 1. The local board of health shall conduct an onsite inspection of the completed abatement and/or interim controls work to ensure that all lead hazards identified on the notice of violation have been treated.2. The local board of health shall issue a written acceptance of the work for the purposes of authorizing the local construction official to close the permit in accordance with N.J.A.C. 5:23.(b) The person performing the abatement and/or interim controls work shall refinish or seal all surfaces where lead paint has been removed or repaired with a non-leaded coating material.N.J. Admin. Code § 8:51-8.1
Amended by R.2010 d.146, effective 7/19/2010.
See: 41 N.J.R. 4604(a), 42 N.J.R. 1535(a).
In the introductory paragraph of (a); inserted "and/or interim controls"; added (a)1 and (a)2; and in (b), substituted "The person performing the abatement and/or interim controls work shall refinish or seal all" for "All", and deleted "shall be refinished or sealed" following "repaired".