Current through Register Vol. 56, No. 21, November 4, 2024
Section 8:51-7.3 - Procedures and work practices for abatement and interim controls(a) All abatement work to remove lead hazards shall conform to the procedures and work practices specified in N.J.A.C. 5:17.(b) All interim controls for exterior lead hazards identified shall conform to the procedures and work practices specified in 8:51-6.2(c).N.J. Admin. Code § 8:51-7.3
Amended by R.2010 d.146, effective 7/19/2010.
See: 41 N.J.R. 4604(a), 42 N.J.R. 1535(a).
Section was "Procedures and work practices for abatement". Inserted designation (a); and added (b).