Current through Register Vol. 56, No. 21, November 4, 2024
Section 7:9A-3.13 - Certificate of compliance(a) Prior to issuance of a certificate of compliance, the administrative authority or its authorized agent shall make sufficient inspections during the course of construction and installation or alteration of the individual subsurface sewage disposal system to determine that the system has been located, constructed and installed or altered in compliance with the requirements of this chapter and the approved engineering design. Alternatively, the administrative authority may issue a certificate of compliance if a licensed professional engineer submits to the administrative authority, a statement in writing, signed and sealed by him or her that the said system has been located, constructed, installed or altered in compliance with the requirements of these standards and the approved engineering design.(b) The administrative authority or authorized agent may require additional permeability tests to be conducted, the disposal field excavation to be deepened, fill material to be added or other changes to be made in the installation of the system if, during the course of excavation, soil limitations not identified previously are discovered. Such changes shall be made as prescribed in 7:9A-3.7.(c) A component of an individual subsurface sewage disposal system shall not be backfilled or otherwise concealed from view until a final inspection has been conducted by the administrative authority or its authorized agent, or a licensed professional engineer, and permission has been granted by the administrative authority to backfill the system. Any component of the system which has been covered without such permission shall be uncovered upon the order of the administrative authority or its authorized agent.(d) A person shall not commence operation or use of an individual subsurface sewage disposal system until a certificate has been issued by the administrative authority or its authorized agent indicating that said system has been located, constructed, installed or altered in compliance with this chapter. The issuance of a certificate of compliance shall constitute only certification that the individual subsurface sewage disposal system has been constructed, located, installed or altered in conformance with this chapter. It shall not be construed as a guarantee that the system will function satisfactorily, nor shall it in any way restrict the powers or responsibilities of the administrative authority or the Department in the enforcement of any law or ordinance relating to public health and safety or environmental protection.(e) The administrative authority or its authorized agent shall give to the building inspector or similar official of the municipality who is responsible for the issuance of occupancy permits a copy of the certificate of compliance.N.J. Admin. Code § 7:9A-3.13