Current through Register Vol. 56, No. 24, December 18, 2024
Section 7:7-4.6 - Permit-by-rule 6 - reconstruction of a residential or commercial development within the same footprint(a) Other than reconstruction within the CAFRA area that meets the exemption from a CAFRA permit at N.J.A.C. 7:7-2.2(c)3, this permit-by-rule authorizes the reconstruction, within the same footprint, of a legally constructed residential or commercial development that has been or could have been legally occupied in the most recent five-year period, provided that such reconstruction: 1. Is in compliance with existing requirements or codes of municipal, State, and Federal law;2. Does not result in the enlargement or relocation of the footprint of the development;3. In the case of a residential development, does not result in an increase in the number of dwelling units;4. In the case of a commercial development, does not result in an increase in the number of parking spaces or equivalent paved area associated with the development;5. Meets the requirements of N.J.A.C. 7:7-9.25; and6. Does not increase the area covered by buildings and/or asphalt or concrete pavement.(b) This permit-by-rule does not apply to repairs or maintenance of the residential or commercial development, such as replacing siding, windows or roofs.N.J. Admin. Code § 7:7-4.6
Renumbered from 7:7-7.2(a)(7) by 47 N.J.R. 1392(a), effective 7/6/2015