Current through Register Vol. 56, No. 21, November 4, 2024
Section 7:45-8.1 - Purpose and scope of review(a) Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission shall review the following for stormwater runoff and water quality impact: 1. Major projects within Zone A;2. Minor projects within Zone A that will result in 800 square feet or more of impervious surface, cumulatively since January 11, 1980; and3. Major projects within Zone B.(b) The scope of review for stormwater runoff and water quality impact includes the following: 1. New impervious surface;2. Redevelopment of existing impervious surface; and3. Collection of stormwater runoff from one-quarter acre or more of existing impervious surface where stormwater is not currently collected. N.J. Admin. Code § 7:45-8.1