Section 7:36-24.4 - Construction requirements; site inspections(a) Green Acres shall periodically inspect the project to ensure compliance with the project agreement established under 7:36-24.1.(b) The nonprofit is responsible for supervising the construction of the project and for ensuring that all construction contract specifications are met.(c) The nonprofit shall submit to Green Acres a copy of each change order processed in accordance with the Local Public Contracts Law, 40A:11-1 et seq. Green Acres encourages the nonprofit to submit all change orders before the nonprofit undertakes the work covered by the change order to ensure that the proposed costs are allowable under the project agreement.(d) The nonprofit shall erect and maintain for the duration of the project a construction sign that identifies the project as Green Acres funded and meets Green Acres' specifications for size, content and design provided with the procedural letter at 7:36-23.3(d). N.J. Admin. Code § 7:36-24.4