N.J. Admin. Code § 7:27B-1.3

Current through Register Vol. 56, No. 19, October 7, 2024
Section 7:27B-1.3 - Operating conditions during the test

Insofar as practical, the source operation will be tested while operating at normal, routine conditions and, as necessary, at other conditions including, but not limited to, design, maximum and fluctuating rates and during sootblowing. For test purposes, the sootblowing operation will be preceded by a time interval of nonsootblowing which is equal to the normal nonsootblowing time period as determined by inspection of plant records or other sources of information available to personnel of the Department.

N.J. Admin. Code § 7:27B-1.3