Current through Register Vol. 56, No. 21, November 4, 2024
Section 7:27-34.11C - Compliance extensions-zero-emission replacement(a) An owner or operator may request an extension of an applicable compliance deadline at N.J.A.C. 7:27-34.6 and 34.7 for any piece of in-use cargo handling equipment that the owner or operator requests to replace with zero-emission cargo handling equipment.(b) The Department will grant the request if the owner or operator provides in its application: 1. Documentation from an equipment or engine manufacturer or dealer that a certified zero-emission engine or equipment is available for the make, model, and horsepower of the cargo handling engine or equipment being replaced;2. Purchase order or other documentation that includes a certification as provided at N.J.A.C. 7:271.39 and shows the owner or operator's intent to purchase the certified zero-emission cargo handling engine or equipment within two years of the applicable compliance deadline; and3. Documentation, or a workplan, demonstrating that the necessary charging or fueling infrastructure to support operation of the zero-emission equipment will be in place within two years of the applicable compliance deadline.N.J. Admin. Code § 7:27-34.11C
Adopted by 55 N.J.R. 142(b), effective 2/6/2023