Section 7:27-34.11A - Compliance extension-manufacturer delay(a) An owner or operator may request a compliance extension of an applicable compliance deadline at N.J.A.C. 7:27-34.6 or 34.7, if the new cargo handling equipment or engine was purchased to comply with N.J.A.C. 7:27-34.6 or 34.7, but has not been received due to manufacturer delays.(b) The Department will grant the extension if the Department determines that the equipment was purchased, or the owner or operator and seller had entered into a contractual agreement for the purchase, at least six months prior to the required compliance date. An application for an extension due to manufacturer delay must include: 1. Identification of the delayed equipment and/or engine type and application, including engine horsepower;2. A purchase order, letter, or other form of documentation that demonstrates that at least six months prior to the original compliance date the owner or operator entered into a contract to purchase equipment and/or engine meeting the requirements at N.J.A.C. 7:27-34.5; and3. Documentation from a representative of the equipment and/or engine manufacturer supporting the applicant's claim of delayed availability, including the anticipated date that the equipment and/or engine meeting the requirements at N.J.A.C. 7:27-34 will be available and able to be delivered to the owner or operator.N.J. Admin. Code § 7:27-34.11A
Adopted by 55 N.J.R. 142(b), effective 2/6/2023