N.J. Admin. Code § 7:27-22.5

Current through Register Vol. 56, No. 19, October 7, 2024
Section 7:27-22.5 - Application procedures for initial operating permits
(a) The application procedures in this section apply to all applications submitted to the Department for initial operating permits.
(b) The owner or operator of a facility subject to this subchapter shall submit a timely and administratively complete application for an initial operating permit. To be considered timely, an administratively complete application for an initial operating permit shall be submitted to the Department no later than the applicable deadline established in this section. An applicant for an initial operating permit is encouraged to submit the application to the Department no less than 90 days prior to the applicable application deadline set forth in this section. Within 30 days of receipt of an application, the Department will issue a letter detailing any deficiencies in respect to administrative completeness in the application, thereby providing the applicant the opportunity to correct the deficiencies prior to the complete application deadline listed at (c) below. An application shall be deemed administratively complete if the Department does not notify the applicant, within 60 days of its receipt of the application, that additional information is required.
(c) For an existing facility subject to this subchapter, the applicable deadline for submitting an administratively complete application for an initial operating permit is the earlier of the deadlines at (c)1 and 2 below that apply to the facility:
1. For an affected Title IV facility with source operations subject to the acid deposition control program Phase II requirements for initial operating permits, the applicable deadline specified at N.J.A.C. 7:27-22.29(b); or
2. For a facility with any source operation designated by the EPA pursuant to 40 CFR 70.3(a)(5) as requiring an operating permit, within 12 months after the effective date of the EPA's designation, or by a later deadline specified by the EPA in its designation.
(d)-(e) (Reserved)
(f) For a new facility subject to this subchapter, the deadline for submitting an initial operating permit application is the later of the following:
1. The applicable deadline set forth at (c) above; or
2. Twelve months after the new facility commences operation.
(g) A new facility subject to this subchapter may either obtain preconstruction permit and operating certificate approval pursuant to N.J.A.C. 7:27-8 or such facility may elect to obtain both preconstruction and operating permit approval simultaneously by the submittal and approval of a consolidated preconstruction and operating permit application pursuant to this subchapter and N.J.A.C. 7:27-8 prior to construction of the facility. In either situation, the facility shall comply with the application deadline in (f) above.
(h) For an existing facility that becomes subject to this subchapter through a change to the facility or to any source operation, or to the use thereof, the applicable deadline for submitting the application for an initial operating permit is the later of the following:
1. The applicable deadline set forth at (c) above; or
2. Twelve months after the new or changed facility commences operation.
(i) For a facility that becomes subject to this subchapter through a change to any applicable requirement, or creation of a new applicable requirement, the applicable deadline for submitting the application for an initial operating permit, if no deadline is specified in the new requirement, is the later of the following:
1. The applicable deadline set forth at (c) above; or
2. Twelve months after the effective date of the new applicable requirement.
(j) If a facility has over 100 source operations, the owner or operator may elect to divide the facility into two or more components, and submit a separate application for an initial operating permit for each component. Such applications shall be submitted on a schedule proposed by the owner or operator and approved by the Department, except that the application for the final component shall be submitted no later than the application deadline established for the facility pursuant to (c) above.

N.J. Admin. Code § 7:27-22.5

Amended by 49 N.J.R. 3590(a), effective 11/20/2017
Amended by 54 N.J.R. 560(a), effective 4/4/2022