Current through Register Vol. 56, No. 21, November 4, 2024
Section 7:13-7.3 - Permit-by-rule 3-in-kind replacement of a lawfully existing structure(a) Permit-by-rule 3 authorizes the in-kind replacement of a lawfully existing structure, provided the conditions at N.J.A.C. 7:13-6.7 are met and: 1. The structure is not located within a floodway;2. The structure being replaced is not a retaining wall or bulkhead subject to the requirements of N.J.A.C. 7:13-12.13 or a habitable building;3. No riparian zone vegetation is cleared, cut, and/or removed, except for vegetation within 20 feet of the structure, where such disturbance is necessary to facilitate its replacement; and4. No more than one-quarter acre of riparian zone vegetation is cleared, cut, and/or removed.N.J. Admin. Code § 7:13-7.3
Adopted by 48 N.J.R. 1067(a), effective 6/20/2016