Table 24.11
Rule Citation | Violation Description | Type of Violation |
7:13-1.4(a)2 ii | Failure of a delegated county governing body to uphold the requirements of this chapter | NM |
7:13-1.4(c) | Failure of a delegated county governing body to permanently retain a copy of all required documents that document that it has discharged its delegated duties | NM |
7:13-2.1(a) | Conducting regulated activities without prior Department approval | NM |
N.J.A.C. 7:13-5.6 | Failure to record the metes and bounds description of a verified flood hazard area and/or floodway limit on the property deed within 90 calendar days of issuance of the verification | NM |
N.J.A.C. 7:13-5.6 | Failure to submit proof to the Department of recording of the metes and bounds description of the verified flood hazard area and/or floodway limit on the property deed within 90 calendar days of issuance of the verification | M |
N.J.A.C. 7:13-6.7, 7, 8, and 9 | Failure to comply with all conditions of a permit-by-rule, general permit-by-certification, or general permit, except as indicated directly below | NM |
N.J.A.C. 7:13-8 and 9 | Failure to submit to the Department any documentation required by a general permit-by-certification or general permit | M |
7:13-10.3 | Failure to comply with all conditions of an individual permit except as indicated directly below | NM |
N.J.A.C. 7:13-10, 11, and 12 | Failure to submit to the Department any documentation required by an individual permit | M |
N.J.A.C. 7:13-13 | Failure to conduct mitigation as required by a Department approval or administrative order | NM |
N.J.A.C. 7:13-13 | Failure to comply with all conditions of a mitigation plan | NM |
7:13-14.1 | Failure to place land intended for mitigation within a conservation restriction | NM |
7:13-14.1 | Failure to submit proof that a conservation restriction has been recorded | M |
7:13-16.3 | Failure to comply with the terms of an emergency authorization, except as specified below | M |
7:13-16.3(e) and (h) | Failure to file a complete permit application and 'as-built' site plans for completed activities authorized under an emergency authorization within 90 calendar days after verbal approval | NM |
7:13-16.3 | Undertaking emergency activities not authorized under 7:13-16.3; undertaking emergency activities that do not meet the design and construction standards of this chapter | NM |
N.J.A.C. 7:13-18 | Submittal of false information by the applicant, its consultants and/or agents | NM |
N.J.A.C. 7:13-18.2(k) | Failure to provide complete and accurate information of which an applicant or its agents are aware, or reasonably should have been aware | NM |
N.J.A.C. 7:13-19 | Failure to provide timely public notice of an application | M |
N.J.A.C. 7:13-22.5(g) | Failure to record a modified verification, authorization under a general permit, or individual permit | NM |
N.J.A.C. 7:13-22.5(g) | Failure to provide proof that a modified verification, authorization under a general permit, or individual permit has been properly recorded | M |
N.J.A.C. 7:13-22.6 | Failure to submit to the Department an application for modification of a general permit authorization or individual permit, should a permittee propose a change in the development | NM |
N.J.A.C. 7:13-22.7 and 22.8 | Failure to comply with the terms of a suspension or termination notice | NM |
N.J.A.C. 7:13-22.8(e) | Failure to properly remediate and restore impacts caused under a terminated permit or approval | NM |
N.J. Admin. Code § 7:13-24.11