N.J. Admin. Code § 7:11-4.3

Current through Register Vol. 56, No. 21, November 4, 2024
Section 7:11-4.3 - Operations and maintenance expense component
(a) The operations and maintenance expense component per million gallons set forth in (c) below is based on estimated annual operations and maintenance expenses consisting of all current costs, obligations and expenses of, or arising in connection with, the operation, maintenance and administration of the Manasquan Reservoir System, and minor additions or improvements thereof or thereto.
(b) The operations and maintenance expense component of all rates is based upon the point of delivery being located at the Authority's Manasquan River intake facility, and any purchaser taking delivery of Manasquan Reservoir System water at a different point of delivery will be assessed an additional charge to cover additional operations and maintenance expense associated with establishment of and making delivery at such point of delivery. Such charges may include, but are not limited to, in the case of any purchaser establishing a point of delivery on the transmission line between the Manasquan River intake facility and the reservoir, an additional charge to cover the cost of pumping water to the reservoir to replace water delivered from the reservoir to such purchaser.
(c) Operations and maintenance expense component:

Effective Date Rate/Million Gallons (based upon a 19.443 mg per day sales base)
July 1, 2024 $445.82

N.J. Admin. Code § 7:11-4.3

Amended by47 N.J.R. 1318(a), Effective June 15, 2015, operative July 1, 2015
Amended by 48 N.J.R. 1065(a), effective 6/20/2016
Amended by 49 N.J.R. 1680(a), effective 6/19/2017
Amended by 50 N.J.R. 1487(a), effective 7/2/2018
Amended by 51 N.J.R. 991(a), effective 6/17/2019
Amended by 52 N.J.R. 1266(a), effective 6/15/2020
Amended by 53 N.J.R. 1084(a), effective 6/21/2021
Amended by 54 N.J.R. 1166(a), effective 6/20/2022
Amended by 55 N.J.R. 1290(a), effective 6/19/2023
Amended by 56 N.J.R. 1239(a), effective 7/15/2024