Current through Register Vol. 56, No. 21, November 4, 2024
Section 7:11-3.27 - Discharge structures(a) Structures for the discharge of water into the Delaware and Raritan Canal shall be installed and maintained by the user thereof at its own sole cost and expense.(b) Prior to the installation of discharge structures or facilities, the user shall furnish to the New Jersey Water Supply Authority a plan showing in such detail as may be required by the New Jersey Water Supply Authority the proposed discharge system, and shall not install or construct the same until said system shall have been approved in writing by the New Jersey Water Supply Authority.(c) The user shall, within ten days after receipt of written demand from the New Jersey Water Supply Authority, make such repair to the user's discharge system as may be required to eliminate leakage of water from, or potential damage to the Delaware and Raritan Canal, or on his failure to do so, the New Jersey Water Supply Authority may make such repairs at the cost and expense of the user, which cost and expense the user shall pay on demand.(d) The user shall make such changes in the user's discharge system as may from time to time be required by the New Jersey Water Supply Authority but shall not alter the approved installation of the system without the prior written approval of the New Jersey Water Supply Authority. N.J. Admin. Code § 7:11-3.27