Current through Register Vol. 56, No. 23, December 2, 2024
Section 5:23-2.22 - Premanufactured construction(a) Premanufactured construction certified in accordance with N.J.A.C. 5:23-4A and 4D, as applicable, and carrying an appropriate label, shall be accepted as conforming to the requirements of the regulations to the extent provided for by the particular label for purposes of local construction inspection approval. 1. Prior to accepting the unit, the appropriate subcode official may require the performance of nondestructive tests.2. In the case of visible signs of damage and/or any visible code violations, the construction official shall consider the seriousness of the nonconformance or damage and accordingly issue a Temporary Certificate of Occupancy or Certificate of Occupancy or deny such Certificate. If a Temporary Certificate is issued or a Certificate is denied, the construction official shall request that the label-issuing agency reaffirm in writing that the assembly still conforms to the regulations and notify the Department in writing.3. No inspection requiring disassembly, damage to, or destruction of certified premanufactured construction shall be conducted.(b) The appropriate subcode officials shall inspect the installation of any premanufactured unit or assembly other than the initial installation of manufactured homes to determine compliance with the regulations and the approved plans. Installation includes all utility connections and all work installed or completed on site.N.J. Admin. Code § 5:23-2.22
Amended by 51 N.J.R. 1269(a), effective 8/5/2019