N.J. Admin. Code § 19:6-2.38

Current through Register Vol. 56, No. 24, December 18, 2024
Section 19:6-2.38 - Splicing of piles

Splices shall be constructed so as to provide and maintain true alignment and position of the component parts of the pile during installation and subsequent thereto, and shall be of adequate strength to transmit the vertical and lateral loads (including tensions) and the moments occurring in the pile section at the location of the splice without exceeding the allowable stresses for such materials as established in section 42 of this subchapter. Except for piles which can be visually inspected after driving, splices shall develop at least 50 percent of the capacity of the pile in bending. In addition, all pile splices in the upper ten feet of the pile section shall be capable of resisting (at allowable working stresses) the moment and shear that would result from an assumed eccentricity of the pile load of three inches, or the pile shall be braced in accordance with the provisions of section 37 of this subchapter to other piles that do not have splices in the upper ten feet of embedment. For piles located near a lot line, the embedded length of such piles shall be determined on the basis that the adjacent site will be excavated to a depth of ten feet below the nearest grade.

N.J. Admin. Code § 19:6-2.38