Current through Register Vol. 56, No. 23, December 2, 2024
Section 17:19-3.9 - Term contract project selection procedures(a) Term contracts may be used by the DPMC to serve a variety of consultant needs in accordance with the DPMC's duties to administer the DPMC's construction portfolio. The initiation of the selection process may be in accordance with the major or the routine project selection procedures, pursuant to 17:19-3.6 or 3.7.(b) Firms are selected based upon technical qualifications and cost.(c) Pre-proposal conference, site visits and interviews may be scheduled.(d) Technical proposals shall be evaluated and ranked in accordance with the specific technical criteria for the project.(e) The selection process regarding the sealed cost proposals shall be in accordance with the major project selection procedures, 17:19-3.6(g), except that costs may be based upon hourly daily rates and/or other methods for determining costs over a specific time period.(f) The selection committee shall have the responsibility to recommend to the Director the selection of the firm that is the highest ranked and whose costs are fair and reasonable to the State.N.J. Admin. Code § 17:19-3.9
Amended by R.2000 d.76, effective 2/22/2000.
See: 31 N.J.R. 4237(a), 32 N.J.R. 712(a).
Rewrote (a).
Recodified from N.J.A.C. 17:19-5.10 and amended by R.2008 d.363, effective 12/1/2008.
See: 40 N.J.R. 3959(a), 40 N.J.R. 6825(a).
In (a), inserted "the" preceding either "DPMC" or "DPMC's" three times and updated the N.J.A.C. reference; in (d), substituted "evaluated" for "rated"; and in (e), updated the N.J.A.C. reference. Former N.J.A.C. 17:19-3.9, Prior notice by DPMC, recodified to N.J.A.C. 17:19-4.9.