Current through Register Vol. 56, No. 23, December 2, 2024
Section 17:11-9.1 - Approval of construction documents(a) The prospective lessor shall provide construction documents to DPMC for approval within the time frames established by DPMC.(b) DPMC shall coordinate the review of the construction documents with the tenant agency, but shall retain the sole authority for approving all construction documents.(c) DPMC may engage a design professional and/or contractor to begin design and/or construction work, as applicable, on the demised premises, in advance of the execution of the lease up to the dollar amount permitted by 52:34-7(a).N.J. Admin. Code § 17:11-9.1
Amended by R.2008 d.228, effective 8/4/2008.
See: 40 N.J.R. 598(a), 40 N.J.R. 4599(a).
In (a) and (b), substituted "DPMC" for "DPM&C" throughout; and added (c).