Current through Register Vol. 56, No. 21, November 4, 2024
Section 13:27-7.4 - Preparation of a major subdivision plan(a) The general location of facilities, site improvements and lot layouts: By an architect, engineer, land surveyor, planner or landscape architect.(b) The design and construction details of all public improvements including street pavements, curbs, sidewalks, sanitary sewage, storm drainage facilities: By an engineer only.(c) Final subdivision map with metes and bounds: By a land surveyor only.N.J. Admin. Code § 13:27-7.4
Petition for Rulemaking.
See: 31 N.J.R. 1215(c), 31 N.J.R. 1385(b).
Amended by R.2011 d.197, effective 8/1/2011.
See: 42 N.J.R. 2208(a), 43 N.J.R. 1882(a).
In (a), deleted a comma following "improvements" and "planner", and deleted "certified" preceding "landscape".