Section 12:90-4.11 - Ultrasonic testing(a) The commissioner may accept ultrasonic test reports as a form of internal inspection for the purpose of compliance with 34:7-14 under certain specific instances upon receipt of application.(b) Ultrasonic testing shall be considered under the following circumstances:1. When it is operationally impractical to take the boiler out of service during the 12-month period;2. If the user has a regularly scheduled, fulltime "in service" inspection program;3. Ultrasonic inspection, in-lieu-of the annual out-of-service and open internal and external inspection, shall be accepted only when it is made within a 12-month period following the internal and external inspection or for a continuous processing operation when it is made within a 12-month period of the previous OB & PVC approved boiler inspection extension. The maximum period between out-of-service and open internal and external inspections shall not exceed 5 years;4. The insurer or the authorized inspection agency indicates acceptance of the ultrasonic testing; and5. A history of the boiler including such items as operational characteristics, results of inspections, corrosion rates and ultrasonic procedures shall be required.6. The owner/user shall have a documented in-service inspection, operation and maintenance program. At the discretion of the OB & PVC, this program shall be subject to field audit prior to approval of the boiler inspection extension.N.J. Admin. Code § 12:90-4.11
Amended by R.1994 d.599, effective 12/5/1994.
See: 26 New Jersey Register 3810(a), 26 New Jersey Register 4828(a).