Current through Register No. 50, December 12, 2024
Section We 604.06 - Responsibility(a) Except as specified in (c), below, it shall be the responsibility of the well owner to have an abandoned well sealed.(b) Upon completing a replacement well installation, a licensed water well contractor shall inform the well owner of the requirements of We 603 and We 604, pertaining to maintenance and abandonment of the existing well.(c) A licensed water well contractor shall be responsible for sealing:(1) A failed borehole, or(2) An abandoned well if the abandonment:a. Resulted from improper well construction, andb. Occurred within 12 months of the date of construction.N.H. Admin. Code § We 604.06
#9179, eff 6-13-08 (from We 604.05 )
Amended by Volume XXXVII Number 2, Filed January 12, 2017, Proposed by #12083, Effective 3/1/2017, Expires 3/1/2027.