If a municipality is in immediate need of bridge construction or reconstruction as a result of an emergency, the bureau shall waive the consultant selection process if the municipality:
N.H. Admin. Code § Tra 501.09
#8923, eff 6-27-07
If a municipality is in immediate need of bridge construction or reconstruction as a result of an emergency, the bureau shall waive the consultant selection process if the municipality:
N.H. Admin. Code § Tra 501.09
#8923, eff 6-27-07