N.H. Admin. Code § Tra 401.09

Current through Register No. 50, December 12, 2024
Section Tra 401.09 - Prequalification Determination
(a) The prequalification committee shall use a combination of classification and capacity rating to determine the qualification of proposed contractors to bid on specific projects.
(b) The dollar value of the contractor's incomplete work as either a prime contractor or subcontractor shall be deducted from the capacity rating. The remainder shall be called the current capacity rating. Final prequalification determinations shall be expressed in terms of current capacity rating.
(c) The department shall notify each applicant who is prequalified of the amount of its current capacity rating and the classification of work on which the applicant shall be eligible to bid during the year.

N.H. Admin. Code § Tra 401.09

#4175, eff 12-1-86; EXPIRED: 12-1-92

New. #5677, eff 7-29-93; ss by #7013, INTERIM, eff 6-20-99, EXPIRED: 10-18-99

New. #7176, eff 12-23-99; EXPIRED: 12-23-07

New. #9452, eff 4-8-09

Amended by Volume XXXVII Number 41, Filed October 12, 2017, Proposed by #12400, Effective 10/4/2017, Expires 10/4/2027.